Moulding and recycling plant sized to your throughput and your supply

Injection moulding, extrusion, blow moulding, granulators and washing lines sourced direct. Two things sink a plastics project more often than machine price — the cost of the tooling nobody budgeted for, and a feedstock supply that turns out to be seasonal.

Range

What we source in this line

Capacities below are the common bands. Tell us the product, the polymer and your monthly tonnage and we'll size the plant to it.

EquipmentTypical rangeWorth specifying
Injection moulding machines60 – 800 tonneClamp force, shot weight, servo or hydraulic
Blow moulding machinesExtrusion & injection stretchContainer volume range, cavity count
Single screw extruders45 – 120 mm screwScrew design for the polymer, output kg/h
Twin screw extrudersCo-rotatingL/D ratio, torque rating, degassing
Blown film linesSingle & multi-layerFilm width and thickness range, output kg/h
Pipe & profile lines16 – 630 mmDie set included, haul-off, cutting
Granulators & shreddersBeside-press to centralThroughput kg/h, screen size, blade cost
Washing linesPET, PP & PEThroughput, water consumption and treatment
Pelletising linesStrand & water ringOutput kg/h, filtration, degassing
Mixers & dosingGravimetric & volumetricAccuracy, number of components
Dryers & dehumidifiersHopper & centralCapacity, dew point, energy draw
Chillers & mould temperatureAir & water cooledCooling kW, refrigerant, ambient rating
Auxiliary conveyingVacuum loadersThroughput, distance, filter maintenance
Moulds & toolingMade to your partSteel grade, cavity count, expected shot life

Not on the list? Send a photo or a model number: we can source most plastics plant in this class.

Before you buy

What actually decides whether it works

Price is the easy part. These are the points that decide whether the plant is profitable or an expensive standstill.

Tooling

The mould often costs more than the machine

A moulding machine without a mould makes nothing, and a mould is made to your part, in steel, with a lead time of its own. This is the single most under-budgeted item in a first plastics project. We quote the tooling alongside the machine so you see the real number from the start.

Feedstock

Prove your supply before you buy the plant

A recycling line is only as good as the material coming in. Baled feedstock supply and price move, and a washing line running at a third of capacity does not pay for itself. Confirm where the material comes from and at what price for a full year before committing.

Polymer

The screw is specific to what you run

A screw designed for PE will not process PVC well and may not survive it. Tell us the exact polymer and whether you are running virgin, regrind or a blend, because it changes the screw design, the drive and sometimes the whole machine.

Power and water

This is heavy plant with real utility demand

South Africa runs 400 V three phase at 50 Hz and plant built for 50 Hz markets matches the frequency, but the connected load is substantial and so is cooling water. Confirm both against your site before ordering — this is not equipment you can move onto a small supply.

Cycle time

Costed output, not rated output

A machine rated at a cycle time achieves it with an optimal mould, a dry material and a good operator. Ask what the realistic cycle is for your part and work your costing from that number, not the brochure one.

Support

You're trading the dealer network for the price

That's the honest trade. There is no branded technician on standby. Budget for a relationship with a good local hydraulics and controls technician, and buy with that in mind — which is an argument for standard drives and controls over proprietary systems.

Straight answers

Manufacturers ask these

Will it run on South African power?

Yes, if it is specified correctly — we specify 50 Hz equipment for a 50 Hz country, so drives and motors run at the right speed. This is heavy three-phase plant, so we confirm the connected load against your actual supply and transformer before ordering, not after.

Do you supply the moulds as well?

Yes, and we quote them with the machine because leaving them out makes a project look cheaper than it is. Tooling is made to your part, in steel, with its own lead time, and it frequently costs more than the machine it goes into.

Is a recycling line a good business here?

It can be, and it depends almost entirely on feedstock. The plant is the easy part to buy. Secure and price your material supply for a full year before you commit, because a washing line running well below capacity does not cover its own cost.

What lead time should I expect?

Longer than the other lines we handle, because moulding machines and extrusion lines are frequently built to order and tooling runs on its own schedule. We give you the supplier's date and we tell you when we think it is optimistic.

Request a quote

Tell us the part and the tonnage, not the model number

What you are making or recycling, the polymer, your monthly tonnage and your site power — that's enough for us to come back with options, a landed price in Rand and a realistic delivery date.

  • Listed prices free to see; anything else is sourced for a fee (factory vetting, visits and freight work), credited in full on your invoice
  • Options at more than one build quality
  • Landed price — freight, duty and clearing included
  • We reply within one working day
Add more detail — helps us quote faster

We use your details only to prepare and follow up on your quote. No lists, no third parties.